HQ MONARO
- Symes Performance
- Apr 6
- 1 min read
Updated: Apr 21
A Hq Monaro came in that had already been mini-tubbed previously, unfortunately the standard tubs had been cut out with an oxy torch and the sqaure tubs that were installed werent up to scratch.
The rail had also been heated up and bashed in with a hammer. So we cut out 30mm and plated the rail with new steel. This allowed fitment of a 295x55 ET Street

We cut the tubs back out, and installed a new set of sqaure tubs from Mcdonald Brothers.





Comments